Home / Guides

Guide

Seaworthy export packing for machinery: crates, VCI, desiccants and ISPM 15

A machine shipped overseas spends weeks in containers, ports and on ships, through changing temperatures and high humidity. Without the right packing, bare metal surfaces can corrode before the machine arrives. This guide explains the methods used for seaworthy packing of machinery and what to check before shipment.

Seaworthy export packing for machinery: crates, VCI, desiccants and ISPM 15

Why sea freight needs special packing

Humidity is the main enemy. When warm, moist air cools down – for example at night or when a ship moves into colder waters – water condenses on the coldest surfaces, often the machine itself. Add salt air, rough handling at transhipment and long storage times, and standard packing is not enough.

Corrosion protection: VCI or barrier film with desiccants

Two methods are common. VCI (volatile corrosion inhibitors) release molecules from a carrier – paper, film or foam – that form a thin protective layer on bare metal inside a closed package. The carrier must be close to the metal surfaces, and products from different manufacturers should not be mixed.

The second method seals the machine in a barrier film – often an aluminium composite foil – together with desiccant bags that absorb the moisture inside. The amount of desiccant is calculated (in Germany according to DIN 55474), and the foil must stay airtight: even a small tear reduces the protection significantly. Wooden or other moisture-absorbing materials should stay outside the barrier.

Service

Need machines packed for sea freight?

We dismantle, preserve, crate and load machines and complete lines for container, flat-rack and break-bulk shipments.

Export packing for machinery →

Crates, skids and saddles

Each component needs a base that fits its weight and centre of gravity. Heavy parts travel on skids or saddles, sensitive units in closed crates. Lifting points and the centre of gravity are marked on the outside so that every crane and forklift operator along the way handles the package correctly. In Germany many companies refer to the HPE packing guidelines as the standard for industrial and export packaging.

  • Clean and preserve exposed metal surfaces
  • Secure moving parts and drain fluids where required
  • Build crates, skids or saddles for each component
  • Mark lifting points, centre of gravity and handling symbols
  • Prepare packing lists so that every package can be identified on arrival

ISPM 15: rules for wooden packaging

Solid wood used for crates, skids and dunnage in international shipping must meet the ISPM 15 standard. The wood is debarked and treated – for example heat treated to 56 °C for at least 30 minutes throughout the profile – and marked with the official ISPM 15 stamp. Processed wood such as plywood is exempt. Packaging without a legible mark can be refused at the destination.

Container, flat rack or break bulk?

Standard containers suit components that fit inside. Oversized or very heavy parts go on flat racks or open-top containers, and the largest pieces are shipped as break bulk. Dimensions and maximum payloads differ between carriers, so the shipping method should be agreed with the freight forwarder before the packing is designed.

FAQ

Frequently asked questions

What is seaworthy packing?

Packing designed for sea transport: it protects the goods against moisture and corrosion, withstands repeated handling and is secured for the movements of a ship. For machinery it usually combines corrosion protection, a crate or skid and proper load securing.

Does wooden packaging for export need ISPM 15?

Yes, solid wood packaging in international trade must be treated and marked according to ISPM 15. Processed wood such as plywood is exempt.

How long does corrosion protection last?

It depends on the method, the materials and how well the package stays sealed. Barrier packaging with desiccants is calculated for a specific transport and storage period – tell your packer how long the machine will travel and be stored.

Tell us about your project

Send us the machine type, weight, current and new location and your timeframe. You will receive a proposed method and a budget estimate.

Thank you – your enquiry has been sent.

We will get back to you within one business day.

Scroll to Top
Request a quote →